Proven Technology, the Key to Success.


Solution 1

Use the improved electronic system fabricated by SETEC-Dresden to optimize the direct-drive wind-turbine.


•  Replace friction-brake and hydraulic.

•  Apply the safe and low maintenance PITCH-system.

•  Apply IGBT CONVERTER and CONTROL-system,

   including SCADA and condition monitoring.


 Solution 2

Sign an agreement on technology transfer or licensed fabrication for the advanced design of the whole WT. 


• All documents for material and definition of fabrication process. All definitions for foundation, tower, nacelle, direct-drive generator and hub.

•  Long-time technical assistance is a matter of course.